Sunday 22 June 2008

Bekok Waterfall 22 June 08

Bekok Waterfall and Batok Pahat 22 June 08
Start Point: GP Esso
Start Time: 1030hrs (delayed due to heavy downpour)
Total 23 bikes


Briefing By Leader of the flock (RSM)

Reach Yong Peng 100km for breakfast cum lunch. We ate Roti Prata and Telur. With drinks only RM4.90
Diddy our friend, the rest are new to us.

The rest had fish ball noodle. Bought some Baked Char Siew Bao for later to snack on since we had no intention going into the water.

Briefing from the leader @ Yong Peng (RSM)


We finally reach the parking lot of the Bekok Waterfall. Outside only indicate Air Trejun.
Road condition consider ok compare to Lake Kenyir experience. The car park descend gradient about 45 deg.

RSM, his wife, CSM's wife and edward.

Goh and his friends

Goh and Diddy

Lao uncle and RSM

Was CSM trying to poo in the water??? it was very cold after the long hours of showers, he was merely trying very hard to resist the cold by using his QI

All having fun


Finally convict this young man to step into the cold water by saying:"Come all the way here, never touch the water....go in with your folded pants and I take your photo lah."

Cold running water massage.




Public Toilet




It took us quite a climb and descend.
At the area, we saw their NPCC cadet camp out here w diesel power generator!


Our bikes parking lots on gravels

Our next stop for Goreng Pisan rojak w soya sauce and chilli 0for RM2@batok pahat.
Ice Kachang is called ABC RM2.50

We had a small group remaining to eat Durian while majority of us head home. We left the town 1730hrs.
Some bikes went straight instead of the round about. U turned and headed for the highway by 1800hrs.
1900hrs we reached GP Esso. Shell petrol kiosk went out of petrol; it created a jam for petrol.
2000hrs reach home.

Sunday 8 June 2008

Lake Kenyir 08 June 08

Time started :0930hrs
Start Point Tana Rata
Route taken: Tana Rata to Blue Valley (Cameron Highlands) Gua Musang 120km. Taman Negara Kuala Koh to New Highway(Lake/Tasik Kenyir) 100km.
Return Route: Lake Kenyir to Mua Musang 100km, Blue Valley 80km, Simpang Pulai 55km.
Time reaching Simpang Pulai heading down south 1900hrs.
Simpang Pulai to Seremban 230km stayed @ highway hotel. Return to Singapore on 9 June 08 noon 280km.


After we bid goodbye the group, we set off to Gua Musang after breakfast around 0930hrs.
We used the tip given by the group prior to ours, enter into Taman Negara Kuala Koh entrance.





The roads look like these after the entrance.

Just before 18km from entrance, we came across the new road entrance.
Turn Right.


The road lead us into the plantation. If we were to continue, there is a more than 20m depression downwards from the road cause by landslide. 17 May 08, the road was still passer able. But not today.




The roads through the plantation post a great challenge to most vehicles. Potholes with deep and gravels all over the place.











At the last directional indicator leading to Taman Negara Kuala Koh Resort, we turn left into the oil palm plantation.

Shortly we get to see the unfinished end part of the proposed New Highway which was suppose to lead from Gua Musang through Kelantan to Trengganu state.

On our right to the Pipe site was constructed board new highway.


The road continues.


More than 55km from the entrance, we could see this wonderfully view which gave us the assurance that this trip was not wasted.








We found this signage which told us the Trengganu part of the highway over the Lake Kenyir was conmissioned 18 Dec 2007.



Then this.....100m of gravel. There were 3 stretch of them along the highway.





It took us 3hours without food, water and toilet facilities before we came across this familiar petrol kiosk which was 1km away from the entrance to Taman Negara -Kuala Koh